Shoreline Improvements

Solicitation details

  • Publication date: 2017-11-06
  • Category: Marine dam engineering
  • Subcategory: Dams
  • Type: Tender
  • Location: St. Clair, ON
  • Bid date: 2017-11-23

Solicitation description

Tender for

Courtright Waterfront Park
Shoreline Improvements – Phase 1
Township of St. Clair, Ontario

Invitation to Tender

The Township of St. Clair and the St. Clair Region Conservation Authority invite tenders for Courtright Waterfront Park Shoreline Improvements – Phase 1.

The work includes the provision of access to site, removal of existing structures, supply and placement of rip rap, armour stone and geotextile, excavation of the bank, restoration of the site and access route and other general site work associated with the construction of approximately 140 metres of an armour stone revetment and other associated works. The project was designed by Shoreplan Engineering Limited, 20 Holly Street, Suite 202, Toronto, Ontario, M4S 3B1, telephone 416-487-4756, fax 416-487-5129.

The tender documents will be available from the offices of the St. Clair Region Conservation Authority starting at 9:00 am Wednesday, November 8th, 2017. There will be a non-refundable deposit of $50.00 for each set of tender documents. Cheques should be made payable to the St. Clair Region Conservation Authority.

Tenders will close at 2:00 PM, Thursday, November 23rd, 2017 at the offices of the St. Clair Region Conservation Authority located at 205 Mill Pond Crescent, Strathroy, Ontario, N7G 3P9, telephone 519 245–3710.

The lowest or any tender will not necessarily be accepted.